Where the craft shows

Wall & Floor Tiling

Tiling is the only part of the bathroom everyone sees, and it is only as good as the screed underneath. We set out every room so cuts land where they should, falls run to the waste, and the niche lines up with the grout lines.

Photo: wall & floor tiling job
Scope

What this job includes.

  • Screeds and falls set out before any tile is laid
  • Large-format porcelain, stone and mosaic laying
  • Recessed niches, shelves and feature walls
  • Mitred edges and trim profiles that match the design
  • Regrout and reseal service for sound bathrooms
Our system: Set-out is drawn before laying starts: cuts hide in corners, grout lines meet the niche, and the floor falls to the waste, every time.
How we quote it

Itemised down to the membrane.

The same seven-line proposal on every job, so this service is comparable against any other quote you collect.

The 7-line quote
  1. 1 The measured design. Laser-measured, drawn with every fixture placed, and signed off by you before demolition is booked.
  2. 2 Strip-out & disposal. Demolition, asbestos check on pre-1990 sheeting, skip and disposal, all on their own line.
  3. 3 Waterproofing, certified. The licensed waterproofer named, the membrane system named, and the certificate lodged. Never "included".
  4. 4 Screeds, falls & tiling. Screed with falls to the waste, tile supply by named range, laying pattern and trim profiles, priced exactly.
  5. 5 Plumbing & electrical. Licensed plumber and electrician, rough-in and fit-off, with compliance certificates itemised, not "allowances".
  6. 6 Fixtures & fittings, named. Vanity, tapware, screen and toilet by brand and model, so "equivalent" can never be swapped in.
  7. 7 Warranty & certificates. 10-year waterproofing and workmanship warranty in writing, plus every certificate in your handover pack.
If a quote doesn’t show these lines, you can’t compare it, and you don’t know what’s been cut.
How it runs

What happens, step by step.

1

Consult & measure

At your place. We measure the room, check the substrate and drainage, and talk budget honestly.

2

Design & fixed price

A drawn design with every fixture placed and a fixed, itemised proposal. You sign the scope, not a sketch.

3

Strip out, waterproof, certify

Demolition, new rough-in, screeds with proper falls, then certified waterproofing, inspected before a tile goes down.

4

Tile, fit off & hand over

Tiling, fixtures and glass installed, site cleaned, and a handover pack with every certificate and warranty.

Insured, covered, guaranteed

The paperwork behind the price.

Public liability to $20M, and a 10-year waterproofing & workmanship warranty, all in writing, all on request.

In Queensland, bathroom work over $3,300 requires a QBCC licence on the contract, and wet-area waterproofing must be done by a licensed waterproofer. Ours are on every proposal, the membrane is certified before tiling, and the 10-year waterproofing and workmanship warranty is in writing in your handover pack.

The cover, the guarantee, and how to check each one.
Questions, answered

Wall & Floor Tiling: common questions.

Can you tile over my existing tiles?
Sometimes physically yes, and almost always we advise against it in wet areas: it hides the membrane condition, raises floor levels against door thresholds, and voids any waterproofing story at sale time. On dry floors and laundry splashbacks it can be a fair saving, and we will say so.
Large format tiles, are they worth it?
In the right room, absolutely: fewer grout lines, calmer surfaces, easier cleaning. They need a flatter substrate and more careful handling, which is real labour we price honestly. In very small rooms with lots of falls, a mid-size tile often looks and performs better.
Get started

Start with a design consult, not a guess.

Tell us about your bathroom. We measure, talk budget honestly, and design to a fixed, itemised price before a single tile is lifted.

✓ QBCC licensed✓ HIA member✓ Licensed & insured✓ 73 five-star reviews✓ 10-year waterproofing & workmanship warranty
Book a design consult Call