The bathroom, properly redone

Full Bathroom Renovations

A full renovation in your existing footprint is our bread and butter: a measured design you sign off, a fixed itemised price before demo day, and certified waterproofing inspected before a single tile goes down.

Photo: full bathroom renovations job
Scope

What this job includes.

  • Measured design with every fixture placed
  • Strip-out with asbestos check on older sheeting
  • Certified waterproofing by a licensed waterproofer
  • Screeds with proper falls, tiling by named range
  • Licensed plumber and electrician, certificates supplied
Our system: Waterproofing is inspected and certified before tiling starts, which is why our warranty runs ten years and not one.
How we quote it

Itemised down to the membrane.

The same seven-line proposal on every job, so this service is comparable against any other quote you collect.

The 7-line quote
  1. 1 The measured design. Laser-measured, drawn with every fixture placed, and signed off by you before demolition is booked.
  2. 2 Strip-out & disposal. Demolition, asbestos check on pre-1990 sheeting, skip and disposal, all on their own line.
  3. 3 Waterproofing, certified. The licensed waterproofer named, the membrane system named, and the certificate lodged. Never "included".
  4. 4 Screeds, falls & tiling. Screed with falls to the waste, tile supply by named range, laying pattern and trim profiles, priced exactly.
  5. 5 Plumbing & electrical. Licensed plumber and electrician, rough-in and fit-off, with compliance certificates itemised, not "allowances".
  6. 6 Fixtures & fittings, named. Vanity, tapware, screen and toilet by brand and model, so "equivalent" can never be swapped in.
  7. 7 Warranty & certificates. 10-year waterproofing and workmanship warranty in writing, plus every certificate in your handover pack.
If a quote doesn’t show these lines, you can’t compare it, and you don’t know what’s been cut.
How it runs

What happens, step by step.

1

Consult & measure

At your place. We measure the room, check the substrate and drainage, and talk budget honestly.

2

Design & fixed price

A drawn design with every fixture placed and a fixed, itemised proposal. You sign the scope, not a sketch.

3

Strip out, waterproof, certify

Demolition, new rough-in, screeds with proper falls, then certified waterproofing, inspected before a tile goes down.

4

Tile, fit off & hand over

Tiling, fixtures and glass installed, site cleaned, and a handover pack with every certificate and warranty.

Insured, covered, guaranteed

The paperwork behind the price.

Public liability to $20M, and a 10-year waterproofing & workmanship warranty, all in writing, all on request.

In Queensland, bathroom work over $3,300 requires a QBCC licence on the contract, and wet-area waterproofing must be done by a licensed waterproofer. Ours are on every proposal, the membrane is certified before tiling, and the 10-year waterproofing and workmanship warranty is in writing in your handover pack.

The cover, the guarantee, and how to check each one.
Proof · recent work

Full Bathroom Renovations jobs we’ve done.

Before
After
Queenslander main bathroom, taken back to the joists, Paddington. A 1920s Queenslander bathroom stripped to the frame: new substrate over moving timber floors, certified waterproofing, walk-in shower and a travertine-look porcelain floor.
Questions, answered

Full Bathroom Renovations: common questions.

How long does a full bathroom renovation take?
A standard full renovation in the existing footprint runs 2 to 3 weeks on site: strip-out and rough-in in week one, waterproofing, screeds and tiling in week two, fit-off and glass in week three. Layout changes add trade time. You get the real schedule with the proposal, not a guess.
Can we stay in the house during the renovation?
Almost everyone does. We sheet off the work area, keep the dust contained, and if it is your only bathroom we plan the strip-out so the toilet is out of action for the shortest stretch possible, and tell you exactly which days those are.
Do you handle the plumbing and electrical?
Yes, through the licensed plumber and electrician we work with on every project, scheduled by us so the trades never hold each other up. Their compliance certificates are itemised in the proposal and included in your handover pack.
Get started

Start with a design consult, not a guess.

Tell us about your bathroom. We measure, talk budget honestly, and design to a fixed, itemised price before a single tile is lifted.

✓ QBCC licensed✓ HIA member✓ Licensed & insured✓ 73 five-star reviews✓ 10-year waterproofing & workmanship warranty
Book a design consult Call